[重要安全性通知] 发现假冒 Qfinder Pro 网站。了解详情 >

Describe the standard boot procedure for ES NAS.


最后修订日期: 2018-03-02

After installing drives and other devices, connect the network and power cables. Next, remove the protective cover from the handle on the front panel's right side. There is a display on the front panel's right handle.

During startup, the numbers 1, 2, 3, 4, 5 will appear sequentially on the display to indicate the startup status of the controllers on the left and right. In the last startup stage, the system will perform a HDD self-test. During this time, the fan will run at full speed for approximately 2 seconds, and may produce a rather loud sound. This is normal behavior.

When the HDD self-test is complete, the front-panel display will show “00”. The four LED indicators on the bottom-left corner of the rear of the controllers will light up in green, indicating that startup is complete and both controllers are working normally.

For more information, please refer to Quick Setup Guide.

The front-panel display indicates the startup status.

这篇文章有帮助吗?

谢谢您,我们已经收到您的意见。

请告诉我们如何改进这篇文章:

如果您想提供其他意见,请于下方输入。

选择规格

      显示更多 隐藏更多
      open menu
      back to top